Tara project : The Tara survey. Interim report.

1. Verfasser: Newman, Conor
Ort/Verlag/Jahr: Dublin : The Discovery Programme, 1995.
Umfang/Format: 62-76 : Abb.
Schlagworte:
iDAI.gazetteer: Tara
Enthalten in: Discovery programme reports : 2. Project results 1993.
LEADER 01013aam a2200301 u 4500
001 001017027
005 20240609064344.0
008 120411s1995 ||||||||| |00||0|||||u
003 DE-2553
035 |a 33217 
091 |a rgkcov2011 
100 1 |a Newman, Conor  |9 72284 
245 1 0 |a Tara project :  |b The Tara survey. Interim report. 
260 |a Dublin :  |b The Discovery Programme,  |c 1995. 
300 |a 62-76 :  |b Abb. 
590 |a brgk 
773 0 |w 000911761  |t Discovery programme reports : 2. Project results 1993. 
942 |c AN 
650 |a Geschichte  |2 yRGKArch12 - Gesch  |9 279940 
650 |a Befestigungen  |2 yRGKArch14 - SiedlArchiBefes  |9 286544 
650 4 |a Höhensiedlungen  |l de  |9 270662 
651 |a Tara  |2 zTopogEuropWesteRepubMeathTara  |9 164177 
650 |a Schriftquellen  |2 yRGKArch02 -  |9 286531 
650 4 |a Höhensiedlungen  |l de  |9 270662 
650 4 |a Prospektionsmethoden  |l de  |9 269055 
040 |a DE-2553  |c DE-2553 
999 |c 765536  |d 765536 
953 |b DAIF  |z Automatically added holding branch key.